Every Smart Export Guarantee tariff

All 50 SEG tariffs Ofgem recorded for the scheme year, with the rate, whether it is tied to taking your import from the same supplier, and what makes a variable rate move. As a file, not a lead-generation form.

Fifty tariffs, as published, as a file.

Supplier, legal entity, tariff name, rate, tied or untied, rate type, what makes a variable rate move, and the dates it ran. Open Government Licence, so you can use it for anything.

Download

UK Smart Export Guarantee export tariffs

50 tariffs — supplier, legal entity, tariff, tied or untied, rate in pence per kWh, rate type, variable mechanism, start and end dates, origin and the date we last verified the row.

Download the CSV · 8 kB · Open Government Licence v3.0

Credit as: Contains public sector information licensed under the Open Government Licence v3.0. Compiled by solar.org.uk from Ofgem’s Smart Export Guarantee Annual Report.

What it shows

Open untied SEG export ratesAll 19 tariffs open to anyone, whoever supplies your import.
0p6.25p12.5pScottish Power — SmartGen12pOctopus — Agile Outgoing Octopus May 20198pOctopus — Agile Outgoing Octopus February8pPozitive Energy — SEG15pBritish Gas — Export and Earn Flex4.71pSo Energy — So Export Flex – Export4.5pOctopus — Octopus Outgoing Smart Export…4.1pOctopus — Octopus Outgoing Smart Export…4.1pOctopus — Affect Smart Export Guarantee…4.1pOctopus — Co-op Smart Export Guarantee…4.1pOctopus — My London Smart Export Guarantee…4.1pOVO — OVO SEG Tariff (AET20)4pE.ON Next — Next Export v13pEDF — SEG Export Variable3pEDF — SEG Export Variable Business3pOctopus — Octopus Business SEG 12M Fixed…3pUtilita — Smart Export Guarantee3pUtility Warehouse — UW Smart Export…2pE (Gas & Electricity) — E SEG January2020…1p

Baseline figures as Ofgem published them for the scheme year named. Not current quotes — check the supplier’s own terms before switching.

pence per kWh. Source: Ofgem, Smart Export Guarantee Annual Report — SEG Year 5, 1 April 2024 to 31 March 2025 · OGL v3.0. The figures · download the data.

The spread is the story. Among tariffs open to anyone, the best rate in this file is twelve times the worst. Switching export supplier costs nothing but the paperwork, which makes it the cheapest lever available to anyone who already has panels — and considerably cheaper than the battery usually proposed instead.

Columns

ColumnWhat it is
supplierThe trading name
supplier_legal_entityThe licensed entity, where it differs — some suppliers hold several
tariffThe tariff name as Ofgem records it
tied_or_untiedtied means available only to the supplier’s own import customers
rate_p_per_kwhRate in pence per kWh
rate_typefixed or variable
variable_mechanismOfgem’s own annotation: supplier review or external index
started, endedDates the tariff ran. ended is empty where it was still offered
originofgem-annual for a baseline row; otherwise how the row was checked
verifiedThe date the row was last checked

Read the origin column

This matters more than any single rate.

A row with origin ofgem-annual is accurate as Ofgem published it for the scheme year named in the file header, and is explicitly not a current quote. Rows checked against a supplier’s own current terms carry a different origin and the date of that check.

We label it this way rather than quietly presenting everything as live, because a tariff table that looks current and is not is worse than one that admits its age.

How it was made

scripts/data/build-seg-baseline.py reads Ofgem’s figures into data/seg-tariffs.yaml; scripts/data/build-downloads.py emits the CSV. A monitor watches Ofgem’s page for change and tells a person to go and read it — it does not parse a number and publish it under our name. A monitor that says “this page changed on Tuesday” costs ten minutes of someone’s attention and cannot be wrong about anything; a scraper that mis-parses a table publishes a wrong number with our byline on it. See how we work.

Sources

  1. Smart Export Guarantee Annual Report — SEG Year 5 Ofgem · Accessed 15 August 2026 · OGL v3.0 Figure 2.1 (untied export tariffs) and Figure 2.2 (tied export tariffs), for the scheme year 1 April 2024 to 31 March 2025.

Contains public sector information licensed under the Open Government Licence v3.0.

Last verified: How we research this Suggest a correction
Was this page helpful?
Sign up to the newsletter